Sign In | Join Free | My infospaceinc.com |
|
Brand Name : KXD
Model Number : S-0082
Certification : CE, ISO, SGS
Place of Origin : Qingdao, China
MOQ : 500 square meters
Price : US$ 50-80 per square meter
Payment Terms : L/C,T/T
Supply Ability : 3000 tons per month
Delivery Time : 30-40 working days
Packaging Details : bulk for steel panels, steel pallet for steel structure, wooden box for small installing accessories
Installation : Free Installing drawing details & Quick on-line technical guide
Prefabrication : Off-site in workshop & Ready for direct installation
Connection : High Strength Bolt connection
Visit : Workshop Visit And Quality Check Acceptable
Turnkey Project : Acceptable
Design : Custom with Free Architectural design
Dimensions : Customers' Requirement
Door : Sliding door or rolling up door
Color : Client's Request
Surface : Hot-dip Galvanized / Painted
Frame : Steel structure
Lifetime : over 50 years
Structure Type : High Strength Steel Structure Frame
Third Party Test : SGS, BV, ITS
Steel Structure Building Introduction:
Pre-engineered steel buildings are buildings made of steel structures and fabricated and installed according to pre-specified architectural and technical drawings. The process of making finished products (with a combination of inspection and quality control steps) goes through 3 main stages: Design, Fabrication of components and Erection at the site. The entire steel structure can be produced synchronously and then delivered to the construction site in a relatively short time.
Features of steel structure building: |
1,Steel structure has light weight; |
2,Steel structure has good seismic and impact resistance; |
3,Steel structure manufacturing is highly industrialized; |
4,Steel structures can be assembled accurately and quickly; |
5,The building can be recycled after disassemble; |
6,Steel structure building construction period is short. |
Steel Structure Building's Specification:
Steel Structure Frame | |
A steel structure is a metal structure made of structural steel members that are connected to each other to carry loads and provide complete rigidity. | Hot-rolled H-section steel is an economical section high efficiency profile with more optimized cross-sectional area distribution and more reasonable strength-to-weight ratio. It is named H steel, because its cross-section as the English letter "H". Hot rolled H-section steel has the advantages of strong bending resistance, simple construction, cost saving and light weight. So now it has been widely applied in steel structure. |
Roof and Wall Cladding System | |
Cladding system in steel structure construction plays an important part. It affects the whole building's energy consumption. | Steel sheet, which is the cheapest without any insulation. EPS Sandwich Panel, which is good insulated but flammable. Glass Fiber Sandwich Panel,which is with general insulation but non-flammable. Rock Wool Sandwich Panel, which is with good insulation and is non-flammable. Pu sandwich Panel , which is most expensive, with prefect insulation and non-flammable and waterproof. |
Connecting Bolts | |
In the site installation, the steel structure components normally adopt bolt connection for the quick and easy processing. In order to meet the bolt connection requirements, the manufacture needs to make holes in the corresponding positions on the surface of the steel components. And the holes' position and dimension must meet the specification requirements. If the installation has trouble of unqualified holes on the site, it will needs the manufacturing rework. It will cause the extra economic losses. |
Steel Structure Building Installation steps:
1.Foundation construction (pre-embedded anchor bolts),
Installing detailed drawing will be offered in advance.
2. Column installation
One worker commands truck crane how to move, 3 ~ 4 workers cooperate with crane to install the steel column, put column to anchor bolt location.
3.Beam installation
After completing the installation of adjacent two steel column, then main beam begin to install.
4.Installing roof & wall purlin
The roof and wall purlin will be installed after finishing column and beam. Bolting the purlin on the main structure.
5.Fixing wall and roof sheet
To fix the wall sheet on wall purlin by self-tapping screw; then fix the roof sheet.
6.Fixing the cover
To install the cover on the corner, eave, window and door opening.
7.Install windows and doors.
KXD Install Service:
We will offer detailed drawings to guide your installing process. Meanwhile, we still offer free technical questions solve in time. And further we offer different plans to choose for different demands.
On-line technical guide in time;
1-2 engineers to guide on site;
Our installing team process all assemble for the client.
KXD's Design Service:
We own more than 20 engineers who have abundant experience for various types buildings. Before design, all requirements will be collected from clients. The design will obey the requirements and pass the calculation check by the architectural soft, such as CAD, PKPM, 3D3S etc.
For the initial planning, we will design the construction blueprint after confirming the client’s requirements details. With the check and feedback from the clients, we will make the revise if possible.
After the confirm, we will make further steel structure detailed drawing to prepare the production. This will still be offered to the clients to confirm. Double check will guarantee the building with correct details.
If necessary, finial 3D model will be offered if needed.
Executed Projects Showcase:
![]() |
High Strength Bolt Connection Glass Curtain Wall Prefabricated Buildings For Shop Office Exhibition Commercial Center Images |